Missoula
Advertisement Advertisement

Reserve Street Gets $1 Million to Try Fixing Its Most Dangerous Turns

Turn restrictions at four intersections, speed signs by the river bridge and trial closures before anything becomes permanent.

Zootown Lowdown Staff

Zootown Lowdown Staff

0 Comments
Zootown Lowdown graphic: This week in Missoula - Reserve Street safety money

If you drive Reserve Street, you already know the problem. The city now has federal money to start working on it.

 

The City of Missoula has been selected for $996,688 from the U.S. Department of Transportation’s Safe Streets and Roads for All program for safety work on Reserve. The whole project is estimated at about $1.25 million; the federal grant covers 80% and the city puts up the remaining $249,172.

 

The numbers behind it

 

Between 2019 and 2023, Reserve Street saw 1,664 crashes, 63 serious injuries and three deaths, according to the city. The corridor is a 5.5-mile state highway, so the work builds on a Reserve Street Safety Action Plan put together by the city, the Missoula Metropolitan Planning Organization and the Montana Department of Transportation.

 

What's actually planned

 

  • Turn restrictions at four unsignalized intersections: International Drive/Stockyard Road, American Way, River Road and Old U.S. Highway 93.
  • Two speed feedback signs near the Clark Fork River bridge, where the city says drivers often go over the posted 45 mph.
  • Trial turn restrictions at up to four more spots between River Road and Brooks Street — tested temporarily before anything is made permanent.
  • Study of driveway and access issues, with tracking of near-misses, speeds and traffic patterns to guide later work.

 

The money splits roughly two ways: $649,808 for permanent intersection changes and $346,880 for planning and the trial demonstrations.

 

Senior transportation planner Charlie Menefee summed up the approach in the city’s announcement: “Some of the most effective safety improvements don’t require major reconstruction.”

 

When

 

Not yet. The award depends on a signed federal grant agreement, and no work can start until that is finalized. The city says it will share timing, the specific improvements and how the public can weigh in as planning moves forward. Missoula Current reports that the longer-term corridor study the plan calls for does not yet have funding.

 

Related: the River Road Phase 1 sidewalk and bike-lane project, which meets Reserve at one of the four intersections.

 

Sources

 

0 Comments

Join the conversation

Be the first to comment

Share your thoughts above.

More from Zootown Lowdown

Zootown Lowdown

© 2026 Zootown Lowdown.

Zootown Lowdown brings Missoula to your inbox with a friendly mix of local news, stories, and happenings. From mountain trails to downtown coffee shops, we spotlight the people, places, and events that make Missoula such a special place to live. Whether you’re a lifelong local or a new neighbor, this newsletter keeps you plugged into the heart of Zootown.

© 2026 Zootown Lowdown.

This publication sponsored by